As early as the preliminary design phase, one should strive for solutions which make simple junctions and thermal bridge details possible. This particularly applies to elements in contact with the soil.

During design and work planning the thermal bridge effects must be assessed and details be drawn that minimize heat loss and are easy to implement in real life.

From the beginning of construction on, coordination between planners and tradesmen must be ensured, in order to implement the details as planned.