Skip navigation

For practice ...

Progress

01 02 03 04 05 06 07 08 09 10

Cloze Activity

Please fill in the gaps in the following text:

Before a start can be made on installing insulation panels, among other things, the  must be prepared in line with current regulations.

In addition,  must have been completed and all  must have been made in line with the state of the art.

The substrate must be d and free from d and g . It is also essential that the substrate is and  .

In the case of interior insulation, any existing wallpaper, old paintwork, panels, etc. must be removed entirely. Any mouldy plaster or salt efflorescence must be tracked down and removed entirely.

The substrate is inspected  , and tested by  , scratching,  and  and  are also tested.

Enable JavaScript

Licensed under the Creative Commons Attribution Non-commercial No Derivatives License 4.0